Ropeways Nigeria making change


Ropeways to build urban ropeways in record time

Published 09 Jan, 2018



The city will also save up to 80 percent in operating costs compared with other passenger transport systems. The detachable GD10 gondola lift with a total of four stations over 3,228 meters allows 2,400 people to be transported over each section and in each direction per hour. The cabins, equipped with seat heating, multimedia information systems and external lighting, and offer an impressive view from up to 60 meters above the ground.

 

In addition to the 106 regular cabins, the ropeway also has two VIP cabins with leather seats, MP3 sound systems and coolers. Once various test runs have been completed over the next 15 days, the ropeway will start operating around the year from 6 am to 12 midnight every day. The stations are impressive as well: In addition to the unusual architecture, special LED systems provide attractive lighting effects during the night.

 

In addition to the 106 regular cabins, the ropeway also has two VIP cabins with leather seats, MP3 sound systems and coolers. Once various test runs have been completed over the next 15 days, the ropeway will start operating around the year from 6 am to 12 midnight every day. The stations are impressive as well: In addition to the unusual architecture, special LED systems provide attractive lighting effects during the night.

 

In addition to the 106 regular cabins, the ropeway also has two VIP cabins with leather seats, MP3 sound systems and coolers. Once various test runs have been completed over the next 15 days, the ropeway will start operating around the year from 6 am to 12 midnight every day. The stations are impressive as well: In addition to the unusual architecture, special LED systems provide attractive lighting effects during the night.